 |
Foliage growing along the road that we'll want/need to trim back.
|
 |
Weeds are growing along the sides of our house too. We need to put grass seed back down.
|
 |
First coat of primer in our master bathroom
|
 |
Primer on the wall with the bathtub
|
 |
Hubby did a great job priming the toilet room |
|
 |
Looking from the toilet room into the tub room
|
Today, hubby & I were able to get some much needed priming done in the master bathroom. We also put a second coat on the other half of the kitchen that needed it. I also started cutting in along the kitchen edges, but didn't finish. Next time we'll finish putting on a second coat in our bath and finish cutting in in the kitchen and hall bath.
We've worked out a plan for the walkway up to the front of the house. We'll use the cardboard Ram paper that we bought until we move in and then we'll put down a wooden walkway that can be rolled out. It'll provide a firm walkway while not messing up the grading and allowing water to flow to the French drain.
No comments:
Post a Comment