Per our excavator, our list looks like this:
  • Clear trees
  • Dig bury hole
  • Grade land
  • Build pad
  • Pour footers (before the end of July)
  • Set the house
  • Order & install skirting
  • Build electric meter base
  • Have electrician tie in electric
  • Set water meter
  • Dig & install water lines (easement?)

    Also:
  • Install septic system 
  • Hook up AC & furnace
  • Build decks
  • Drywall & trim work
  • Strip cabinet doors
  • Strip cabinets in kitchen
  • Paint
  • Replace back door & SGD
  • Replace windows as needed
  • Move in
  • Install internet