We all arrived at the lot around 11:30am, and ended up right behind the guys with the concrete pump. We pointed them in the right direction, since they weren't sure how much further down the road it was. Once we got there, we pulled into the empty lot next door and set up camp on the ridge overlooking our lot so we'd be out of the way. It also gave us a nice view. Once the concrete truck arrived, they got to work pouring into the dug out border and footer holes. We didn't get to stay for the whole thing because we had other things to do, but we're very excited to have been able to see the beginning! Hopefully the rain keeps away long enough for them to finish pouring the concrete. I heard they're calling for rain Thursday and Friday. I'm possibly meeting the electric engineer out there Friday, so we'll see!
Wednesday, August 2, 2023
Pouring the Concrete!